Solution · Boomkikker, formerly Kerf
In trials
Cutting lists thatcome out asmachine files.
Boomkikker takes the list a carpenter already writes and turns it into something a beam saw executes. Nobody at the machine retypes a measurement.

Workshop Dutch → Machine binary
The angle you drag on screenis the angle that comes off the saw.
The gap
Somebody isretyping numbers.
Between drawing and saw, someone retypes numbers. Every typo costs timber. Boomkikker removes that step.

Every board was a decision upstream
Formats
Three formats,one of them undocumented.
Hundegger BVX has no public spec, so it was calibrated on real production files.
12Real production files in the corpus
879Parts checked on every release
9,100Machine operations, roughly
BTLx 2.0.0
Checked against the official schema before the file leaves.
Hundegger BVX
Calibrated on the corpus above, re-checked every release.
Hundegger BVN
Supported, same discipline, same corpus.
Three jobs, start to finish
What it isactually used for.
Illustrative jobs, not case studies.
01Sixty rafters
Drawn once, cut sixty times.
02A job that arrives as a file
Opened, checked, run. No phone call.
03A wall moves on Friday
New drawing, new parts, new file.
Start here
Trials are open to workshops,not to everyone.
Run a beam saw? Name the machine and get an honest answer on fit.